Miranti left malakas to come to Wenzhou will be Taiwan response to class yesterday afternoon, "Meranti" has arrived near the city of Taixing, Jiangsu Province, the largest wind 7, typhoon "Meranti" in our city has been completed. Followed by the typhoon "malakas", 16 o’clock yesterday, the city flood control office anti typhoon emergency response will be adjusted to the third level, preparing for the sixteenth typhoon "malakas". 16, "Maleka" center more than and 800 kilometers away from Wenzhou, the center of pressure of 94 thousand and 500 kPa, near the center of the largest wind 15 (48 m / sec), according to the meteorological department is expected to, "Maleka" will be the speed of north west direction of 20 kilometers per hour to move, gradually increase the intensity, will enter the East China Sea in tomorrow morning. Affected by it, tomorrow afternoon, the city’s coastal sea level 8~10 winds, 18, 9~11 wind. In addition to the influence of wind, 16~17, the city’s sometimes overcast with showers, large local rainfall reporter learned that, influenced by the "Meranti" typhoon, the heavy rain, the water level in the ponds and reservoirs are generally high, some reservoirs over flood control water level. As of 8 pm yesterday, rainfall reached 389 mm Zeya process, Quxi process of surface rainfall of 300 mm, maximum rainfall of 491 mm plow Yang site, Zeya reservoir water level reached 106.74m (flood control level 104.97m), a small reservoir is up to 82%. Shifang Zhi asked all localities and departments to do the sixteenth typhoon "malakas" defense work, and improve the safety management of ponds and reservoirs, scheduling control in strict accordance with the approved operating plan, strict implementation of the "dangerous reservoir emptying, reservoir storage limit"; to flash floods and geological disaster prevention work, departments of geological disaster and have flood disaster area to conduct a comprehensive investigation. All departments should seize the limited time, repair damaged works, especially traffic, communication and electric power to reopen for the first time; on the spur of the moment can not complete the repair, to effectively implement the emergency flood prevention measures, and set up warning signs signs, to ensure that no danger of anything going wrong.相关的主题文章: